Ongoing Project
The project aims to develop calculations and practical experience to define a production process that integrates, within the construction and assembly phases of the ship’s hull, all operations required to install the most advanced structural decoupling systems for vibro-acoustic insulation of decks. The goal is to combine the benefits of these systems with the advantages of standardized shipyard processes.
PROJECT DURATION: 18 months
TOTAL BUDGET: €243,552.64
FUNDED CONTRIBUTION: €97,421.06